One screen for the whole house network: the floor plan, the three racks, every documented drop and link, power and PoE, and everything still open. Built from the same records that drive the rest of this site, so what you see here is what the workbook, diagrams, and decisions actually say.
Click a room to list what is installed there. Geometry is traced from the architectural plan and marked Estimated until surveyed.
Front elevations drawn from device records (rev 2026-08-17). Click a unit for its role, power feed, and evidence.
The STRG wall field by physical panel (map rev 2026-08-17). Click a keystone to trace it. Security drops show a port number only. 38 of the 39 landed keystones are still in the 08-14 photographed order and wait on the re-landing worklist.
Follow a drop from the wall plate to the panel, the surge path, and the switch. Switch ports are assigned at patch day.
Unverified items, capacity limits, and conflicts the records still carry.
Circuits, UPS units and PDUs with estimated load against capacity.
| Feed | Kind | Fed by | Load / cap | Status |
|---|
Newest first. Older values are struck through, never deleted.
Device-to-device links from the connection inventory. Filter by layer.
| ID | From | To | Via | Media · speed | Layer | Status |
|---|